Whole House Remodeling

The front entry at our whole house remodeling project has the brickwork completed, the walks and the roof in place. The underside of the roof will be completed soon, once the electrical work is installed. The covered entry really enhances the look of the home. And with Minnesota weather it is nice to have an entry area the keeps the snow and rain away.

Our interior work has also moved along nicely. The kitchen cabinets have been installed, as well as the stone countertops. The clients selected a frame and panel door in the Shaker style which fits with the homes decor. The interior doors in the home have been replaced too. We mainly used oak flat panel doors, but installed nine-light glass doors into the family room.

We cut up areas of the concrete floor in the lower level and moved plumbing lines to create a hospitality area with a small sink. The countertops in this area are also smooth stone material and there is ceramic tile for the backsplash.