Whole house remodeling

In spite of some very wet weather we managed to get the foundation for the new entry porch installed on our whole house remodeling job. The brickwork has been installed, creating the porch walls. We have carpentry work to do to create the roof at the porch, which will really change the appearance of the home.

The framing for the interior stairway has been completed. The new stairway has a short flight to a landing, then another flight on down to the lower level. This creates a much more gentle stairway to travel on and is safer should there be a fall.  It also opens up the front entry so that you can look right through the house and out the dining room windows.