Eastside Porch

If you’ve been to lunch or dinner at the Ole Store you’ve probably seen our crew at work on our porch project across the street. We finished the foundation work and capped it with a concrete floor to create a water tight, solid floor structure. We are now working on framing the roof system. We are hand cutting the rafters which we typically do on a small roof like this. To maintain a low profile on the porch we are using a hip roof that slopes on the front three sides.