We moved on to the building portion of our East side Northfield renovation project. The first task was to remove all the trims and save them for reuse. We then removed the finish wall and ceiling surfaces, and the little bit of insulation that was in used. One of the main focuses of this project is to increase the insulation levels in the attic area. The framing actually allows for a good level of insulation at the ‘rafter heel’, about 11″. So once that is installed and ventilation is added, the room should function properly. We did uncover some rather unique framing at the walls, but nothing that we can’t deal with.