Picture 005 (2) Lots of work has been taking place at the Apple Valley Senior Center project. The building has been enclosed for some time now and a small army of workers are performing a variety of tasks. With the enclosing and heating of the building the concrete floors were able to be installed throughout the facility.

The interior walls are being erected using steel studs.Picture 004 (2) Electricians are busy running conduits for the electrical system as are plumbers, pipe fitters and sheet metal workers for the mechanical systems. Our crews have been busy installing interior door frames this week.

Part of the building has a two-story high area. This creates a very dramatic and light filled room. I’m anxious to see how this area looks once all the finishes are in place.