Prior Lake Dental Clinic

100_4274 We have moved on to the final phase of our work at100_4275 the Prior Lake dental clinic we are working on. The first phase was the addition, the second phase was the construction of the new toilet and administrative areas. This third phase is the removal of the existing toilet and construction of a new entry on the east side of the building. Much of the exterior work on the building has been completed. Steel hand railings will be going in shortly at the new walkway.

100_4276 The new entry area is framed, the new roof installed and has had the aluminum windows and doors installed. We are finishing insulation and drywall work in this area.