100_4396 We completed the majority of the demolition work at Elwell Hall that we are renovating for Laura Baker Services. The plumbing has been installed below grade and the new concrete floor was laid late last week.

Most of the window openings have been modified to100_4398 accept the new windows we will be installing. The existing walls are all masonry, so we cut the opening larger and install new steel beams for header lintels.  We then frame around the new opening with wood in preparation for installing the new window.