Hospital Office Building

We’ve just about finished up our interior remodeling work at the office conversion for the Northfield Hospital. Some walls were relocated, cabinets removed and others installed, doors closed up, new doors added, etc. The interior of the building has pretty much been totally repainted and looks very nice. The designers picked good looking colors that add warmth to the building.  The flooring contractor has been busy installing the new flooring materials.

The exterior of the building will be repainted once the spring weather permits. We’ve closed up some door openings and cut in new doors in other areas, as well as replaced and repaired the existing siding. Once the building is repainted it will change it dramatically. The final task will be to construct a whole new parking area.