With the students away on winter break we are ramping up our work renovating elevators at Carleton College. Over the fall we completed quite a bit of code required improvement upgrades. This work was not too noisy or dirty so it could be done when the college is in session.

100_3225 We are trying to complete much of the heavier, dirtier100_3226 work on a couple of the elevators when the college is not in session. This work typically involves removing elevator entrance doors and installing new sliding doors, making repairs to the elevator shafts, installing new rails and the car, etc. When we are done with these elevator renovations they essentially will be ‘new’ elevators.