We are working on the interior of the Baker Cottage at Laura Baker Services in Northfield. Once the concrete floor was installed our trade partners started work with us. The water service was relocated to its proper location and Olympic Fire Protection completed work on the valves for the fire sprinkler system. They also installed some of their branch lines above the ceiling.

The drywall is being installed on the ceiling. Mechanical and electrical work was completed in the attic. We install the drywall before we start wall framing. That provides a continuous fire rated gypsum barrier between the attic and the living spaces. The walls in the building will be constructed using steel framing materials.